NACEL Energy Corporation, a wind power company in business to generate clean, renewable energy, today confirmed it has entered into two long term wind development rights agreements covering an aggregate of 636 acres in Donley County, Texas. Hedley Pointe is the Company’s fourth Texas wind energy project located in the Panhandle. At project build-out, NACEL Energy anticipates 10 MW, or more, of power generating capacity from Hedley Pointe. NACEL... Read more..
NACEL Energy Corporation, a wind power company in business to generate clean, renewable energy, today confirmed it has commenced the collection of site specific wind measurement data at its Channing Flats project site in Moore County, Texas, with the installation of a 60 meter (200 ft.) NRG Systems meteorological tower transmitting data back to NACEL Energy, via an Iridium satellite uplink. NACEL Energy’s analysis indicates that the construction... Read more..
Over the past year, the research team at the CORUS Centre installed a new multi-measurement tower – innovative in design – that will be used to test wind measurement instruments in a cold climate conditions. Located at an altitude of 910 metres on Mont Aiguille in Murdochville, this tower will notably analyse equipments designed by NRG Systems, from the United States, and Vaisala, from Finland. Both of these companies are reputed to be... Read more..